| |
| STEP 2 - Building |
 |
 |
Next is building the kit according to instructions. Note
that nips are visible when the parts are cut out from the runner. This is unavoidable. Just
assemble the parts together and then unassembled in parts for the paint touch up.
|
 |
The accessories. Note that the extra jet pack is painted in
wrong color. This need to be re-spray with the intended color. |
 |
I ran a round of inspection on it. There
are joints line that identified on the lower arms and feet and these need to be sanded. |
 |
The areas needed to be sanded are
identified by the red arrows. These can be completed in about 3 to 4 hours.
|
Document Date : 18.01.2006
Responses to this page: